Facilities

Inspections - UMSS 240728

General

MSS conducted, on July 28, 2024, a walk through of the upper MSS main building. This is not an inspection. Rather, it is a walk-through by laymen to capture obvious maintenance issues and concerns and to provide a current baseline pending the implementation of the maintenance plan.

The upper MSS Kinder building, though built in the 1960's seems structurally sound. It was designed for open airflow at a time when electricity was mainly for lighting. The main issue now is how to remodel the building to enable air conditioning and heavier and more complex electrical demands.

Observations are summarized below.

ObservedNeed
Electrical system is undocumented (no blueprint). Distribution panels were added over the years, now three, with distribution wires in and on the walls or ceilings. The circuits are not documented and it is unclear if dedicated circuitry is available per classroom.This may require the services of a professional. It should be documented for general safety and maintenance, and potential future remodeling/renovations.
Electrial - lighting and fixtures. Switches and outlets need to be replaced and lights need to be standardized. The meter is in the restroom, reachable by students.An electrician is needed to repair/reconfigure the circuitry, replace outlets and switches, and standardized the lighting. Relocation of eletrical meters and distribution panels to a secure utility room is warranted for student safety.
Water/sewage system undocumented (no blueprint). The restroom has been moved to the east of the building, with one toilet remaining in the original location. This toilet has issues with slow flushing.This may require the services of a professional. It should be documented for general maintenance and potential future remodeling/renovations.
Doors. The 21 exterior doors need repair and alignment to the frame and replacement hardware (hinges, doorknobs, and deadbolts).A carpenter may need to fix the door frames and replace all 5 of the 7 exterior doors and replace or install doorknobs and deadbools.
Windows (about 1,600 sqft). A new window design needs to be implemented to convert the existing open block type window to accommodate air conditioning. Recently plexiglass had been attached to the concrete to cover the windows.The six louvered windows (210 sqft) need to be changed to accommodate airconditioning.
Restrooms. The restrooms are in fair condition but feel dark and plumbing and fixtures need repair. Also tiling could improve the look and feel.Plumbing and fixture repairs, and installation of tiles and better lighting.
Maris Stella School

Maris Stella School is an Elementary School in Koror, Palau, established by the Catholic Church in 1957.
Main Road Box 757, Koror, PW 96940

Links

To be ...

Other

To be ...

Other

To be ...